What Is the Theory of Constraints (TOC)? 5 Focusing Steps & Throughput Accounting
Dr. Eliyahu Goldratt’s groundbreaking framework for optimizing system constraints and throughput.
Home › Accounting Glossary › Theory of Constraints
| Creator | Dr. Eliyahu M. Goldratt (1984 book ‘The Goal’) |
|---|---|
| The 5 Focusing Steps | Identify, Exploit, Subordinate, Elevate, Repeat |
| Throughput Accounting Metrics | Throughput (T), Investment/Inventory (I), Operating Expense (OE) |
The Theory of Constraints in plain English
A chain is only as strong as its weakest link. Pulling harder on the strong links does not make the chain any stronger; to lift heavier weight, you must strengthen the single weakest link.
TOC applies this truth to business: every company has a single operational constraint (a machine, an engineer, or sales demand) that dictates the pace of the entire enterprise. Optimizing non-constraints is an illusion; all management focus must be directed at the bottleneck.
The 5 Focusing Steps of TOC
- Identify the Constraint: Locate the specific operational step or machine with the largest backlog of work.
- Exploit the Constraint: Ensure the constraint never sits idle (never take lunch breaks at the bottleneck; run it 100% of the time).
- Subordinate Everything Else: Align all non-bottleneck machines to feed the constraint at exactly the speed it needs—no faster, no slower.
- Elevate the Constraint: Invest capital to expand capacity (buy a second machine, hire extra technicians).
- Repeat (Prevent Inertia): Once elevated, the constraint moves somewhere else. Go back to Step 1!
Throughput Accounting vs GAAP Costing
| Dimension | Throughput Accounting (TOC) | Traditional GAAP Costing |
|---|---|---|
| Inventory Valuation | Valued strictly at raw materials cost ($0 labor/overhead capitalized) | Absorbs direct labor and allocated overhead into balance sheet assets |
| Incentive | Discourages excess inventory; building unneeded WIP produces no profit | Incentivizes overproduction to absorb fixed overhead and boost paper profits |
| Focus | Increasing Throughput (cash from sales) while reducing Operating Expenses | Cutting costs across every department regardless of bottleneck status |
Common mistakes
- Treating all factory machines as equally important: Wasting engineering time optimizing a machine that runs at 40% capacity creates zero company-wide throughput gain.
- Allowing the bottleneck to run out of materials: An hour of downtime at the bottleneck is permanently lost revenue for the entire company.
Frequently asked questions
What is Drum-Buffer-Rope (DBR) in TOC?
The execution method where the bottleneck acts as the ‘Drum’ setting the pace, the ‘Buffer’ protects it with inventory cushion, and the ‘Rope’ controls material release into the plant.
How does TOC define Throughput?
Throughput is the rate at which the system generates money through sales: Throughput = Sales Revenue – Truly Variable Costs (Raw Materials).