What Is Kaizen Costing? Continuous Improvement, Philosophy & vs Target Costing

The Japanese lean management practice of relentless small-scale efficiency gains during live production.

Home › Accounting Glossary › Kaizen Costing

Quick answerKaizen Costing is a cost accounting philosophy and methodology focused on continuous, incremental cost reductions and waste elimination throughout the active manufacturing production phase, empowering front-line workers to optimize daily processes.
OriginJapanese manufacturing (Toyota Production System; ‘Kaizen’ = change for good)
Phase appliedActive Manufacturing / Production Phase
Compare withTarget Costing (cost reduction during the design and engineering phase)

Kaizen costing in plain English

While traditional standard costing compares actual costs against a static annual standard, Kaizen Costing sets a dynamic goal: costs must decrease every single month through small, practical worker suggestions.

Instead of relying on executives for massive overhauls, Kaizen relies on assembly workers tweaking tool layouts, eliminating two steps of walking, or reducing packaging materials by 5%.

Kaizen Costing vs Standard Costing

FeatureStandard CostingKaizen Costing
Underlying GoalMeet established cost standards (maintain status quo)Continuously reduce costs below standard (continuous improvement)
StandardsStatic, revised annuallyDynamic, revised monthly with lower targets
Driver of ChangeIndustrial engineers and managersFront-line factory floor workers and cross-functional teams
FocusVariance investigation (finding who failed the budget)Waste elimination (identifying operational improvements)

Worked example

Toyota set a Kaizen cost reduction target of 1.5% per month for a hybrid battery assembly cell. Current unit cost is $800. The target for next month is $788 ($800 x 0.985). Workers redesign the wire harness routing, shaving 45 seconds of labor and saving $14 per battery, exceeding the Kaizen reduction target.

Common mistakes

Common mistakes
  • Confusing Kaizen Costing with Target Costing: Target Costing occurs before production begins (design phase); Kaizen Costing occurs during active production.
  • Failing to involve factory floor workers: Kaizen succeeds only when front-line workers have direct authority to test and implement small-scale improvements.

Frequently asked questions

How are Kaizen targets established?

Kaizen targets are determined by analyzing historical actual costs from the prior period and applying an agreed-upon percentage cost reduction rate.

Can Kaizen costing lead to worker burnout?

If implemented strictly as top-down pressure to work faster, yes. True Kaizen focuses on eliminating frustration, wasted motion, and fatigue, making work easier.