What Is the High-Low Method? Formula, Step-by-Step Calculation & Limitations

The quick algebraic formula for decomposing mixed expenses into fixed overhead and variable rates.

Home › Accounting Glossary › High-Low Method

Quick answerThe High-Low Method is an algebraic cost estimation technique that separates a mixed cost into its fixed and variable elements by analyzing the change in cost between the historical periods with the highest and lowest levels of operational activity.
Cost equation formulaTotal Cost (Y) = Fixed Cost (a) + [Variable Rate per Unit (b) x Activity Level (X)]
Variable rate formulab = (Cost at Highest Activity – Cost at Lowest Activity) / (Highest Activity – Lowest Activity)
Primary advantageSimple, fast calculation requiring no complex statistical software

High-low method in plain English

A factory’s monthly electric bill is a mixed cost: there is a basic connection fee that must be paid even if zero machines run (fixed cost), plus extra charges for every kilowatt-hour consumed (variable cost).

If you don’t have advanced regression software, the High-Low Method lets you quickly separate the fixed base fee from the per-unit variable rate using just two data points from your records: your busiest month and your slowest month.

Step-by-step calculation procedure

  1. Identify High and Low points: Select the periods with the highest and lowest activity levels (NOT highest/lowest cost).
  2. Calculate Variable Cost per Unit: Divide change in cost by change in activity: b = Δ Cost / Δ Activity.
  3. Solve for Fixed Cost: Substitute (b) into the total cost formula at either the high or low point: Fixed Cost = Total Cost – (b x Activity).
  4. Construct Cost Equation: Total Cost = Fixed Cost + (Variable Rate x X).

Worked example

MonthMachine Hours (Activity)Maintenance Cost
Highest Month (October)8,000 MH$34,000
Lowest Month (February)3,000 MH$19,000
Difference (Δ)5,000 MH$15,000

Variable Cost per MH (b) = $15,000 / 5,000 MH = $3.00 per machine hour.
Fixed Cost (a) = $34,000 – ($3.00 x 8,000) = $34,000 – $24,000 = $10,000.
Cost Formula: Total Maintenance Cost = $10,000 + ($3.00 x Machine Hours).

Common mistakes

Common mistakes
  • Selecting high and low based on dollars instead of activity: You must always pick the high and low periods based on the independent variable (units or hours), never cost.
  • Vulnerability to outliers: If the high activity month coincided with an abnormal equipment explosion, the resulting cost formula will be severely skewed.

Frequently asked questions

How does the High-Low Method compare to Linear Regression?

Regression analysis uses all available historical data points and is statistically more reliable; the high-low method uses only two extreme points and ignores intermediate data.

Within what range is the high-low formula valid?

Only within the relevant range of operating activity. Projecting outside that range produces inaccurate results.