What Is an Allocation Base? Definition, Selection & POHR Calculation
The cost driver denominator that bridges factory overhead pools to individual job cost sheets.
Home › Accounting Glossary › Allocation Base
| Also called | Cost allocation driver, activity denominator |
|---|---|
| Common examples | Machine hours (automated plants), direct labor hours (labor-intensive plants), direct labor cost |
| Formula role | Denominator in the Predetermined Overhead Rate (POHR) formula |
Allocation bases in plain English
If a factory pays $500,000 in monthly rent, electricity, and machine maintenance, it cannot trace those bills directly to an individual chair or table. The factory must choose an allocation base to share the cost fairly.
If the plant is heavily automated, machine hours serve as the best allocation base: a product that consumes 4 hours of machine time absorbs twice as much overhead as a product that consumes 2 hours.
The Predetermined Overhead Rate (POHR) formula
Selecting the right allocation base
| Manufacturing Environment | Best Allocation Base | Reason for Selection |
|---|---|---|
| Automated Robotics / CNC Machining | Machine Hours (MH) | Overhead (electricity, maintenance, depreciation) is driven by machine runtime |
| Handcrafted Furniture / Custom Assembly | Direct Labor Hours (DLH) | Facility overhead supports workers performing manual assembly |
| Standard Wage Rates Across Departments | Direct Labor Cost ($) | Convenient when payroll dollars track operational effort consistently |
Common mistakes
- Using labor hours in automated plants: Using direct labor hours to allocate overhead in a robotic facility causes massive product cost distortion.
- Using a non-causal allocation base: The base must have a clear cause-and-effect relationship with the incurrence of overhead costs.
Frequently asked questions
Can a company use multiple allocation bases?
Yes. Under Departmental Costing or Activity-Based Costing (ABC), multiple allocation bases are used to match diverse overhead cost pools.
Why is estimated base volume used instead of actual?
Estimated volume allows establishing the overhead rate before the fiscal year begins, enabling real-time job costing without waiting for year-end actual totals.